|
|
|
|
|

ProToCal > Basic Surveying > Geometric Levelling

Calculation:

Open or closed leveling from 4 to 20 points. Includes the compensation in closed leveling or by final points known (open).
 
Field book:
Select an option          
No compensation
Compensation by first and end point with known Z
Compensation by closed levelling
           
 
Z (m)
   
Z (m)
 
First Point:
 
End Point:
 
           
Initial levelling:    
Return levelling:
   

 
 
Number of points:      
             
Station ID
Back
Foward
Back
Foward
1
2
3
4
 
5
 
6
 
7
 
8
 
9
 
10
 
 
             

Type of user:


Developed by: antmozas; jlperez ; jdelgado y jcardena.
© University of Jaén. Department of Cartographic, Geodetic Engineering and Photogrammetry.
Campus "Las Lagunillas" s/n. Edificio A-3. 23071. Jaén (Spain).